|
期刊论文 [1].Q. H. Zhu,M. C. Zhou,Y. Qiao,N. Q. Wuand Y. Hou, “Multiobjective Scheduling of Dual-blade Robotic Cells in Wafer Fabrication,”IEEE Transactionson Systems, Man, and Cybernetics: Systems, vol. 50, no. 12, pp.5015-5023, Dec. 2020. [2].Q. H. Zhu,M. C. Zhou,Y. Qiao, andN. Q. Wu.“Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools,”IEEE Transactionson Systems, Man, and Cybernetics: Systems, vol. 48, no. 3, pp.389– 400, Mar.2018 [3].Q. H. Zhu,M. C. Zhou,Y. Qiao, andN. Q. Wu.“Scheduling Transient Processes for Time-Constrained Single-arm Robotic Multi-cluster Tools”,IEEE Transactionson Semiconductor Manufacturing, vol. 30, no. 3, pp. 261– 269, Aug.2017 [4].Q. H. Zhu,N. Q. Wu, Y. Qiao, and M. C. Zhou, “Scheduling of Single-Arm Multi-cluster Tools With Wafer Residency Time Constraints in Semiconductor Manufacturing,”IEEE Transactionson Semiconductor Manufacturing, vol. 28, no.1, pp. 117-125, Feb. 2015 [5].Q. H. Zhu,N. Q. Wu, Y. Qiao, and M. C. Zhou, “Petri Net-Based Optimal One-Wafer Scheduling of Single-Arm Multi-Cluster Tools in Semiconductor Manufacturing,”IEEE Transactionson Semiconductor Manufacturing, vol. 26, no. 4, pp. 578~591, Nov. 2013. [6].Qinghua Zhu, Huan Tang, Jiajie Huang, and Yan Hou, “Task scheduling for multi-Cloud computing subject to security and reliability constraints”,IEEE/CAA Journal of Automatica Sinica,vol. 8, no. 4, pp. 848–865, Apr. 2021. [7].Yan Hou, YiXian Zhang, NaiQi Wu, andQingHua Zhu, “Constrained multi-objective optimization of short-term crude oil scheduling with dual pipelines and charging tank maintenance requirement,”Information Sciences, Vol. 588, pp. 381-404, 2022 [8].Yan Qiao, Mengchu Zhou, Naiqi Wu, Zhiwu Li, andQinghua Zhu. Closing-Down Optimization for Single-Arm Cluster Tools Subject to Wafer Residency Time Constraints.IEEE Transactionson Systems, Man, and Cybernetics: Systems, 2021,51 (11):6792-6807.(2022年半导体制造自动化最佳论文奖,IEEE RAS) [9].Yan Qiao, Nai Qi Wu, Fa Jun Yang, Mengchu Zhou,Qing Hua Zhu, and Ting Qu. Robust Scheduling of Time-Constrained Dual-Arm Cluster Tools With Wafer Revisiting and Activity Time Disturbance.IEEE Transactionson Systems, Man, and Cybernetics: Systems, 2019,49 (6):1228-1240. [10].Yan Qiao, Naiqi Wu, Fajun Yang, Mengchu Zhou, andQinghua Zhu. Wafer sojourn time fluctuation analysis of time-constrained dual-arm cluster tools with wafer revisiting and activity time variation.IEEE Transactionson Systems, Man, & Cybernetics: Systems, 2018,48 (4):622-636 [11].Y. Qiao, M. C. Zhou, N. Q. Wu,andQ. H. Zhu. Scheduling and Control of Startup Process for Single-Arm Cluster Tools with Residency Time Constraints.IEEE Transactionson Control Systems Technology, vol. 25, no. 4, pp.1243- 1256, July 2017 [12].Y. Qiao, N. Q. Wu,Q. H. Zhu, and L. P. Bai, “Cycle Time undefinedysis of Dual-Arm Cluster Tools for Wafer Fabrication Processes with Multiple Wafer Revisiting Times”,Computers & Operations Research, Vol. 53, January 2015, pp. 252–260. 会议论文 [13].QingHua Zhu, AnBang Lu, and Yan Hou, “Energy- and Cost-Aware Scheduling for Task-Dependency Applications in Mobile Edge Computing,” 2022 IEEE International Conference on Computer Supported Cooperative Work in Design, Hangzhou, China, May 2022, pp. 1016-1021 [14].Hongpeng Li,Qinghua Zhu, and Yan Hou, “Scheduling a Single-arm Robotic Cluster Tool with a Condition-based Cleaning Operation”, 2022 IEEE International Conference on Systems, Man, and Cybernetics (SMC), Prague, Czech, Oct. 2022, pp. 1205-1210 [15].B. Li,Q. Zhu, Y. Hou, and J. Zhou, "Scheduling Single-Arm Multi-Cluster Tools With Regulation of Post-Processing Time,"2021 IEEE International Conference on Networking, Sensing and Control (ICNSC), Xiamen, China, Dec. 2021, pp. 77-82 [16].J. Huang,Q. Zhuand Y. Hou, "Energy-sensitive Scheduling for Cloud Data Centers Prone to Failures,"2020 IEEE International Conference on Networking, Sensing and Control (ICNSC), Nanjing, China, 2020, pp. 1-6 [17].Q. Zhu, J. Yuan, G. Wang and Y. Hou, "Scheduling Robotic Two-Cluster Tools in Case of a Process Module Failure," IEEE International Conference on Systems, Man, and Cybernetics (SMC), Toronto, ON, Oct. 2020, pp. 1374-1379 [18].Q.H. Zhu,M.C. Zhou, Y. Qiao, and N.Q. Wu, “Close-down Process Scheduling of Wafer Residence Time-Constrained Multi-cluster Tools”,2017 IEEE International Conference on Robotics and Automation, Singapore, May 2017, pp.543-548(中国计算机学会推荐B类高水平会议) [19].Q. H. Zhu, M.C. Zhou, Y. Qiao, and N. Q. Wu, “Scheduling Close-down Processes Subject to Wafer Residency Constraints for Single-arm Cluster Tools”, 2015IEEE International Conference on System, Man, and Cybernetics, Hongkong, Oct. 2015, pp. 521-526 [20].Q. H. Zhu, N. Q. Wu, Y. Qiao, and M.C. Zhou, “Scheduling of Single-Arm Multi-Cluster Tools to Achieve the Minimum Cycle Time”,in 2013IEEE International Conference on Robotics and Automation, Karlsruhe, Germany, May 2013, pp. 3555-3560.(中国计算机学会推荐B类高水平会议) 专利 授权2项美国专利。 [21].Naiqi Wu,Qinghua Zhu, Yan Qiao, and Mengchu Zhou, Optimal One-wafer Scheduling of Single-Arm Multi-Cluster Tools with Tree-Like Topology, 10001773, A1, June 19, 2018. [22].Naiqi Wu,Qinghua Zhu, Mengchu Zhou, and Yan Qiao, Optimally Scheduling of Close-Down Process for Single-Arm Cluster Tools with Wafer Residency Time Constraints, 10001772, A1, June 19, 2018. |